Sai Leela Arcade
Sai Leela Arcade is a residential project by Sai Nagesh Constructions in Jeedimetla Village 1, Hyderabad district, Telangana. It is registered with the Telangana RERA as P03100003350 (status: On-Going Project). The approving authority named in the filing is GHMC (plan approval 2/C15/07493/2018). The promoter filed a total site area of 668 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 30/04/2024.
Description
Sai Leela Arcade is a residential apartment project with 15 homes in one tower, arranged over five floors on 668.34 sq m of land. The TG-RERA filing lists the project as ongoing, with a proposed completion date of 17 April 2024.
- Project type
- Residential (apartment)RERA filing
- Units
- 15RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 668.34 sq mRERA filing
- Possession
- 17/04/2024RERA filing
- Status
- On-Going ProjectRERA filing
Gallery


Configurations & sizes
The approved floor-plan drawings are scans pending measurement, so no CogArea carpet-area measurements are available. The TG-RERA filing records 3BHK homes at 121.11 sq m saleable area (9 units, 0 booked) and 2BHK homes at 84.92 sq m saleable area (6 units, 0 booked).
| Type | Saleable | Source |
|---|---|---|
| 3BHK | 121.11 sq m | RERA filing |
| 2BHK | 84.92 sq m | RERA filing |
Amenities
The disclosed amenities include recreational, security and utility features.
- Green Strip/TOT LOT/Park
- kids' play areas / sand pits
- 24 x 7 security
- normal park / central green
- indoor games
- Power Backup
- Security
- ample bike parking
- swimming pool
- gym
- children's play area
- clubhouse
- covered car parking
Specifications
- flooring
- Master bedroom and other bedrooms: vitrified tiles
- flooring
- Living area: vitrified tiles
- Living Area-Flooring
- Vitrified Tiles
- Master Bedroom-Walls
- Oil Bound Distemper
- structure
- RCC frame structure
- walls
- Master bedroom and other walls: oil bound distemper
Location & connectivity
The project is in Jeedimetla, Hyderabad, Telangana-500055, in the filed locality JEEDIMETLA VILLAGE 1. Nearby listings place New Little Lilly High School at 0.4 km, Meenakshi Estates Park at 0.9 km, Russh Hospital at 0.6 km, and Nizamabad Road / NH 44 approximately 0.2 km away.
- New Little Lilly High School0.4 km
- Meenakshi Estates Park0.9 km
- Russh Hospital0.6 km
- Nizamabad Road / NH 44 approximately0.2 km
Promoter
The promoter is SAI NAGESH CONSTRUCTIONS, recorded as a proprietorship. The named architect is KOTA SIVA PRATYUSHA and the named structural engineer is VENKATA RAO.
Sources & web results
- Sai Leela Arcade Jeedimetla, Hyderabad99acres.com
- RERA No. P03100003350 - sai leela arcadeaurumproptech.in
- Sai Leela Arcade in Jeedimetla, Hyderabadproptiger.com
- 0+ Flats for Resale in Sai Leela Arcade, Jeedimetla, Hyderabadhousing.com
- Sai Nagesh Constructions Leela Arcade in Jeedimetla, ...aurumproptech.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- SAI LEELA ARCADE
- Developer / Promoter
- SAI NAGESH CONSTRUCTIONS
- Project type
- Residential
- RERA Registration No.
- P03100003350
- Registration Status
- On-Going Project
- Approved on
- 30/04/2018
- Proposed completion
- 30/04/2024
- Approving authority
- GHMC
- Plan approval no.
- 2/C15/07493/2018
- Total site area
- 668 sq m (0.2 acres)
- Approved built-up area
- 2,270 sq m (0.6 acres)
- Buildings (approved plan)
- 1
- Locality
- JEEDIMETLA VILLAGE 1
- District
- Hyderabad
- PIN code
- 500055
- Documents on File
- 16
Frequently asked questions
Is SAI LEELA ARCADE registered with Telangana RERA?
Yes. SAI LEELA ARCADE is registered with the Telangana Real Estate Regulatory Authority as P03100003350; the registration status is On-Going Project.
Who is the developer of SAI LEELA ARCADE?
The promoter named in the RERA registration is SAI NAGESH CONSTRUCTIONS.
Where is SAI LEELA ARCADE located?
SAI LEELA ARCADE is in JEEDIMETLA VILLAGE 1, Hyderabad, Telangana (500055).
When will SAI LEELA ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2024. This is the promoter's declaration, not a guarantee.