Shanthi Constructions
Shanthi Constructions is a residential project by Shanthi Constructions And Developers in Waddepally, Hanamkonda district, Telangana. It is registered with the Telangana RERA as P00300000681 (status: On-Going Project). The approving authority named in the filing is DTCP. The promoter filed a total site area of 698 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 12/07/2024.
More from Shanthi Constructions And Developers · 4 projects →
Description
This is a residential apartment project recorded as On-Going Project in the TG-RERA filing. The filing records 15 homes in one tower, across five floors, on 698.1 sq m of land, with proposed completion dated 12/07/2024.
- Project type
- Residential (apartment)RERA filing
- Units
- 15RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 698.1 sq mRERA filing
- Possession
- 12/07/2024RERA filing
- Status
- On-Going ProjectRERA filing
Gallery

Configurations & sizes
The 2BHK carpet area measures 69.8–74.5 sq m from the approved drawings; this is a drawing measurement, not a RERA disclosure, and should be verified against the drawing. The TG-RERA filing records 10 such homes, 0 booked, with saleable area of 96.36 sq m. For 3BHK homes, the measured carpet area is 95.9 sq m from the approved drawings, not a RERA disclosure, and should be verified against the drawing; the filing records 5 homes, 0 booked, with saleable area of 124.04 sq m.
| Type | Saleable | Source |
|---|---|---|
| 2BHK | 96.36 sq m | RERA filing |
| 3BHK | 124.04 sq m | RERA filing |
| Plot | 1350 Sq. Ft | Developer site |
| Plot | 2895 Sq. Ft | Developer site |
Amenities
The listed amenities include a park or green strip and car parking, alongside project infrastructure.
- Green Strip/TOT LOT/Park
- Car Parking
Location & connectivity
The RERA-recorded location is Waddepally, Warangal Urban, PIN 506004.
Promoter
The promoter is SHANTHI CONSTRUCTIONS AND DEVELOPERS, recorded as a partnership. The filing records three other registered projects, and its official website is https://www.shanthiconstruction.com/. VAMSHI KRISHNA BUKKA is named as architect and R SURYA NARAYANA as structural engineer.
Filed vs marketed
The RERA filing gives the locality as WADDEPALLY, while developer marketing on proptiger.com describes it as Hanamkonda, Warangal.
- Locality: proptiger says Hanamkonda, Warangal; the RERA filing says WADDEPALLY. proptiger
Sources & web results
- Shanthi Constructions in Hanamkonda, Warangalproptiger.com
- Flats for rent in Shanthi Constructions, Waddepally Warangal -99acres.com
- SHANTHI CONSTRUCTIONS Medchal-Malkajgiriaurumproptech.in
- Shanthi Constructions in Prashanthnagar Colony, Warangalhousing.com
- SHANTHI CONSTRUCTIONS AND DEVELOPERSbhumiboss.com
- Shanthi Trikuta Residency in Prashanthnagar Colony, ...housing.com
- 2 BHK by Shanthi Constructions And Developersproptiger.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- SHANTHI CONSTRUCTIONS
- Developer / Promoter
- SHANTHI CONSTRUCTIONS AND DEVELOPERS
- Project type
- Residential
- RERA Registration No.
- P00300000681
- Registration Status
- On-Going Project
- Approved on
- 12/07/2018
- Proposed completion
- 12/07/2024
- Approving authority
- DTCP
- Total site area
- 698 sq m (0.2 acres)
- Approved built-up area
- 1,584 sq m (0.4 acres)
- Buildings (approved plan)
- 1
- Locality
- WADDEPALLY
- District
- Hanamkonda
- PIN code
- 506004
- Documents on File
- 17
Frequently asked questions
Is SHANTHI CONSTRUCTIONS registered with Telangana RERA?
Yes. SHANTHI CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P00300000681; the registration status is On-Going Project.
Who is the developer of SHANTHI CONSTRUCTIONS?
The promoter named in the RERA registration is SHANTHI CONSTRUCTIONS AND DEVELOPERS.
Where is SHANTHI CONSTRUCTIONS located?
SHANTHI CONSTRUCTIONS is in WADDEPALLY, Hanamkonda, Telangana (506004).
When will SHANTHI CONSTRUCTIONS be completed?
The promoter's proposed date of completion filed with RERA is 12/07/2024. This is the promoter's declaration, not a guarantee.