Suryodaya Abode Block B
Suryodaya Abode Block B is a residential project by Sipil Infra Private Limited in Khanamet, Serilingampally, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400007377 (status: New Project). The approving authority named in the filing is GHMC. The promoter filed a total site area of 683 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 30/11/2026.
More from Sipil Infra Pvt Ltd · 3 projects →
Description
Suryodaya Abode Block B is a residential apartment project recorded as a new project with TG-RERA. The filing records 10 homes in one tower over five floors, on 683.13 sq m of land, with proposed completion on 30/11/2026.
- Project type
- Residential (apartment)RERA filing
- Units
- 10RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 683.13 sq mRERA filing
- Possession
- 30/11/2026RERA filing
- Status
- New ProjectRERA filing
Gallery

Configurations & sizes
The 3BHK carpet area measures 118.5–134.9 sq m in the approved floor-plan drawings (median 134.8 sq m); this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawing. The TG-RERA filing records 10 such units, 3 booked, and a saleable area of 222.12 sq m.
| Type | Carpet | Saleable | Source |
|---|---|---|---|
| 3BHK | 2,391 sqft | 222.12 sq m | RERA filing |
Amenities
The listed amenities include recreation, building services, security and sustainability features.
- Green Strip/TOT LOT/Park
- 24Hrs Backup Electricity
- Vastu / Feng Shui compliant
- Garden
- Maintenance Staff
- Power Backup
- Elevator
- Car Parking
- CCTV
- Jogging Track
- 24-hour backup electricity
- compound
- entrance gate with security cabin
- gated community
- landscaped garden
- lawn
- seating area
- security personnel
- waste management
- natural ventilation
- eco-friendly roofing
- electric vehicle charging stations
- Entry Exit Gate
- Fire Fighting Equipment
Specifications
- Project Status
- Under Construction / Ready to Move
Location & connectivity
The project is in Khanamet, Serilingampally, Ranga Reddy district, at Izzath Nagar, Hyderabad. Hitech City Railway Station is listed at 0.6 Km.
- Hitech City Railway Station0.6 Km
Promoter
The promoter is SIPIL INFRA PRIVATE LIMITED, a private limited company with 2 other registered projects. The named architect is Venkatesh Ramarum and the structural engineer is R Sambasiva Rao.
Additional details
Sources & web results
- SIPIL Suryodaya Abode in Izzathnagar, Hyderabadmagicbricks.com
- P02400007377, Hyderabad - SIPIL Suryodaya Abodesquareyards.com
- westsiderealty.in
- homes247.in
- Flats & Apartments for Sale in SURYODAYA ABODE BLOCK B ...nobroker.in
- SIPIL INFRA PRIVATE LIMITED | SURYODAYA ABODE BLOCK Bbhumiboss.com
- Suryodaya Abode Block B in Hyderabadquikr.com
- SIPIL Suryodaya Abode Block B Location Maphomes247.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- SURYODAYA ABODE BLOCK B
- Developer / Promoter
- SIPIL INFRA PRIVATE LIMITED
- Project type
- Residential
- RERA Registration No.
- P02400007377
- Registration Status
- New Project
- Approved on
- 01/06/2023
- Proposed completion
- 30/11/2026
- Approving authority
- GHMC
- Total site area
- 683 sq m (0.2 acres)
- Approved built-up area
- 1,681 sq m (0.4 acres)
- Buildings (approved plan)
- 1
- Locality
- Khanamet
- Mandal
- Serilingampally
- District
- Rangareddy
- PIN code
- 500084
- Documents on File
- 13
Other registrations of Suryodaya Abode
Frequently asked questions
Is SURYODAYA ABODE BLOCK B registered with Telangana RERA?
Yes. SURYODAYA ABODE BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02400007377; the registration status is New Project.
Who is the developer of SURYODAYA ABODE BLOCK B?
The promoter named in the RERA registration is SIPIL INFRA PRIVATE LIMITED.
Where is SURYODAYA ABODE BLOCK B located?
SURYODAYA ABODE BLOCK B is in Khanamet, Serilingampally, Rangareddy, Telangana (500084).
When will SURYODAYA ABODE BLOCK B be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.